532 km
Overall Length
€1,800 M+
Total investment
4 years
EPC Term
20 years
Concession Period
  • 532 km
    Overall Length
Item 1 of 4
Troncal II
Concession road infrastructure under a PPP scheme of 272 km in length from Sabana de Torres (Santander) to Curumaní (Cesar). Relevant figures. Construction of second roadway: 139.3 km. Upgrading and rehabilitation: 116.2 km. Vehicular bridges: 260 By-passes: 16
Troncal I
Concession road infrastructure under a PPP scheme of 260 km in length from Puerto Salgar (Cundinamarca) to Barrancabermeja (Santander). Relevant figures. Construction of second roadway: 146.4 km. Improvement and rehabilitation: 152.9 km. Vehicular bridges: 84 By-passes: 8
own resources
Machinery and Industrial Units

The demanding logistical challenges posed by both concessions have prompted the Group to invest heavily in its own resources in order to guarantee production, fulfilment of its commitments to customers and the Group's quality standards. These resources include a fleet of machinery comprising more than 300 pieces of equipment, as well as the creation of a significant industrial infrastructure. Without being exhaustive, we highlight the creation of 8 industrial crushing units - including fixed and mobile - and 5 asphalt plants, equipped with the necessary equipment to cover the needs of both projects.